Picture3.jpg

Natural Gas Pipeline Replacement – FortisBC

SIZE: $3,900,000
DURATION: 2015-2017

Marwest completed the installation of new “transmission pressure” sweet natural gas pipeline, including approximately four kilometers of 273mm diameter, and three kilometers of 114mm diameter pipe. This work included both directional drilling methods (HDD) and open trench methods, as well as steep slope work necessitating the temporary use of NPS 3 flex pipe bypass pipeline.

Part of this work involved revenue share partnerships with Williams Lake Indian Band and Xat’sull First Nation.

PREVIOUS ROW Clearing and Access Roads - Chevron Canada (PTP)
NEXT Tank Terminal and Road Grading – Pembina
RETURN